Diretso sa content

Article 92 sa Labor Code: Kanus-a pwede pugson ang trabaho sa rest day

Status: Epektibo pa

Unsa ang giingon sa Article 92?

Ang opisyal nga teksto sa balaod naa sa English.

The employer may require his employees to work on any day:

(a) In case of actual or impending emergencies caused by serious accident, fire, flood, typhoon, earthquake, epidemic or other disaster or calamity to prevent loss of life and property, or imminent danger to public safety;

(b) In cases of urgent work to be performed on the machinery, equipment, or installation, to avoid serious loss which the employer would otherwise suffer;

(c) In the event of abnormal pressure of work due to special circumstances, where the employer cannot ordinarily be expected to resort to other measures;

(d) To prevent loss or damage to perishable goods;

(e) Where the nature of the work requires continuous operations and the stoppage of work may result in irreparable injury or loss to the employer; and

(f) Under other circumstances analogous or similar to the foregoing as determined by the Secretary of Labor and Employment.

Basaha ang Labor Code sa website sa DOLE (karaan pa ang article numbers didto, sa wala pa ang 2015)

Unsa ang buot ipasabot niini sa simple nga pulong?

Naglista ang Article 92 sa Labor Code sa mga kaso nga pwede pugson sa employer ang empleyado nga motrabaho sa bisan unsang adlaw, lakip ang gi-iskedyul nga rest day: emergency ug kalamidad, dinalian nga trabaho sa makinarya, abnormal nga kadaghan sa trabaho, mga butang nga dali madunot, continuous operations, ug susama nga mga kaso nga gitakda sa Secretary of Labor and Employment. Ang trabaho sa rest day bayran uban ang premium nga dili moubos sa 30%.

Pareho gihapon ang numero sa artikulo human sa 2015 nga renumbering sa Labor Code, sumala sa makita sa renumbered edition sa DOLE. Ang mga pulong niini gikan sa Presidential Decree No. 850 (1975).

Giunsa kini paglihok sa tinuod nga kinabuhi?

Erwin: baha sa planta

Domingo ang rest day ni Erwin. Sa Sabado sa gabii, misulod ang baha sa planta ug nameligro ang mga makina. Gipatawag siya sa iyang employer sa Domingo aron motabang sa pagbalhin sa mga kagamitan. Sakop kini sa paragraph (a): tinuod nga emergency tungod sa baha, aron malikayan ang kapildihan sa kabtangan. Pwede siya pugson nga motrabaho, ug bayran siya og rest day premium.

Lorna: espesyal nga rush order

Nakadaog og dakong order ang employer ni Lorna ug gusto niini nga motrabaho ang mga staff sa ilang rest day sulod sa tibuok bulan. Ang dakong order, sa iyang kaugalingon, dili usa sa mga kaso nga gilista. Ang paragraph (c) naghisgot og abnormal nga kadaghan sa trabaho tungod sa espesyal nga kahimtang nga dili kasagaran madahom nga mogamit ang employer og laing paagi. Kung sakop ba niini ang kaso ni Lorna, nagdepende kana sa mga detalye. Kung dili, dili siya pwede pugson batok sa iyang gusto, apan pwede siya mo-volunteer pinaagi sa sulat.

Dante: operator sa power plant

Nagtrabaho si Dante sa planta nga kinahanglan modagan nga walay hunong, tungod kay madaot ang mga kagamitan kung i-shutdown. Gitugotan sa paragraph (e) ang employer nga pugson ang trabaho sa bisan unsang adlaw kung ang trabaho nagkinahanglan og continuous operations ug ang paghunong mahimong hinungdan sa irreparable injury o kapildihan. Bayran gihapon uban ang premium ang iyang trabaho sa rest day.

Unsa ang buot ipasabot niini sa praktis?

Unsa ang giingon sa Article 92?

The employer may require his employees to work on any day:

Article 92, Labor Code

(a) In case of actual or impending emergencies caused by serious accident, fire, flood, typhoon, earthquake, epidemic or other disaster or calamity to prevent loss of life and property, or imminent danger to public safety;

Article 92, Labor Code

(b) In cases of urgent work to be performed on the machinery, equipment, or installation, to avoid serious loss which the employer would otherwise suffer;

Article 92, Labor Code

(c) In the event of abnormal pressure of work due to special circumstances, where the employer cannot ordinarily be expected to resort to other measures;

Article 92, Labor Code

(d) To prevent loss or damage to perishable goods;

Article 92, Labor Code

(e) Where the nature of the work requires continuous operations and the stoppage of work may result in irreparable injury or loss to the employer; and

Article 92, Labor Code

(f) Under other circumstances analogous or similar to the foregoing as determined by the Secretary of Labor and Employment.

Article 92, Labor Code

Unsa ang gidugang sa implementing rules?

Ang implementing rules sa Labor Code (1989 nga teksto sa Supreme Court E-Library), Book III, Rule III, Section 6, naghatag og susama nga lista. Duha ka kaso niini ang angay hinumdoman: trabaho nga tungod sa kinaiya niini kinahanglan magpadayon og pito o labaw pa ka adlaw sa usa ka semana, sama sa crew sa barko nga nagkompleto sa biyahe, ug trabaho nga gikinahanglan aron mapahimuslan ang maayong panahon o kahimtang sa palibot kung didto nagdepende ang performance o kalidad sa trabaho.

Ang samang section nagtakda sa limitasyon: gawas sa mga kahimtang nga gilista, walay empleyado nga pwede pugson batok sa iyang gusto nga motrabaho sa iyang gi-iskedyul nga rest day. Ang empleyado nga boluntaryo nga motrabaho sa rest day sa ubang kahimtang magpahayag niini pinaagi sa sulat, ug magamit gihapon ang mga lagda sa dugang bayad sa Section 7.

Unsaon pagbayad ang trabaho sa rest day?

Matod sa Article 93, ang empleyado nga gipatrabaho o gitugotan nga motrabaho sa iyang gi-iskedyul nga rest day bayran og dugang nga dili moubos sa 30% sa regular wage. Ang mga oras lapas sa walo sa rest day overtime ubos sa Article 87: ang rate sa rest day plus dugang nga dili moubos sa 30% niini. Ang table sa premium pay rates nagpakita sa mga rate nga magkatupad.

Kanunay nga pangutana

Pwede ba ko pugson sa akong employer nga motrabaho sa akong rest day?

Sa mga kaso lang sa Article 92: emergency ug kalamidad, dinalian nga trabaho sa makinarya, abnormal nga kadaghan sa trabaho, mga butang nga dali madunot, continuous operations, ug susama nga mga kaso nga gitakda sa Secretary of Labor and Employment. Matod sa 1989 nga implementing rules, gawas niining mga kaso walay empleyado nga pwede pugson batok sa iyang gusto nga motrabaho sa iyang gi-iskedyul nga rest day.

Pwede ba ko mo-volunteer nga motrabaho sa akong rest day?

Oo. Matod sa implementing rules, ang empleyado nga boluntaryo nga motrabaho sa iyang rest day sa ubang kahimtang magpahayag niini pinaagi sa sulat, ug magamit gihapon ang mga lagda sa dugang bayad.

Pila ang bayad sa pagtrabaho sa rest day?

Matod sa Article 93, ang trabaho sa gi-iskedyul nga rest day bayran og dugang nga dili moubos sa 30% sa regular wage. Ang mga oras lapas sa walo sa rest day bayran ubos sa Article 87.

Adunay bay laing kaso nga gidugang sa implementing rules?

Oo. Ang 1989 nga implementing rules naglakip sa trabaho nga kinahanglan magpadayon og pito o labaw pa ka adlaw sa usa ka semana, sama sa crew sa barko nga nagkompleto sa biyahe, ug trabaho nga gikinahanglan aron mapahimuslan ang maayong panahon o kahimtang sa palibot.

Kinatibuk-ang impormasyon lang kini, dili legal nga tambag. Alang sa imong kaso, pangutana sa abogado, sa Public Attorney's Office (PAO) o sa ahensya.

I-share kini nga page

MessengerViberWhatsApp

Nakatabang ba kini nga page?

I-report ang daan o sayop nga impormasyon

Ayaw ibutang ang personal nga detalye sama sa ngalan, ID number o password.